15 MW live in Big Lake, Texas
AI capacity, already energized.
An operating West Texas site, converting to AI capacity with a path to 25 MW.
Services
Capacity for AI training and inference, from the first 5 MW to a 25 MW campus.
-
AI data center capacity
Power, space and cooling for large AI deployments, with customers bringing their own hardware. Capacity converts in phases, starting with the first 5 MW, toward a 25 MW campus.
-
Investment and partnership
On-site diligence, a review of power, land and network, and a path from proof-of-concept budget to term sheet.
About Us
Santa Rita Computing is converting an operating site in Big Lake, Texas into an AI data center campus. The interconnection is done, fiber is on site, and the next 10 MW is already in the queue.
15 MW live.
10 MW queued.
A 13.8 kV feed is already on the pad, and transformers T1 to T8 feed zones separately. Another 10 MW is in the interconnection queue, targeted for Q3 2027.
- 25 MWPlanned campus, 2027
- 13.8 kVFeed on site
- 8Transformer zones
- 15 acresWith room to expand
Why this site.
15 MW is not a drawing. It is load that is billed and running today.
-
Power you don't wait for
The full 15 MW is interconnected and billed today. There's no greenfield substation to permit or build before the first racks go in.
-
A path to 25 MW
Another 10 MW is already in the utility's interconnection queue, and will be built to AI specification from the start.
-
Infrastructure in place
Eight pad-mounted transformers each feed their own zone. Pads sit beside the load, so feeder runs are short and isolation is fast.
-
Fiber on the pad
Fiber is connected today. A second route or satellite backup can be layered onto the existing last mile.
-
Air or liquid cooling
The dry climate suits evaporative and dry coolers, and closed-loop liquid cooling can run on well water with municipal makeup.
-
Room to grow
Fifteen acres with offices, workshops, a warehouse and staff housing, plus space for expansion, backup generation or storage.
Converting in phases, without going dark.
Each phase is sized to signed demand. The existing operation keeps running while capacity moves over to AI.
-
Today
15 MW at full load
The site runs at full load while diligence validates power, network, operations and land title.
-
Phase 1
First 5 MW for AI
Freed for proof-of-concept AI racks, with refreshed power distribution, fiber and monitoring.
-
Phase 2
Conversion to demand
Remaining zones convert against signed customer demand, starting nearest the transformers and fiber.
-
Phase 3, 2027
25 MW campus
The new 10 MW is built to suit from day one, joining the converted site as one campus.
Contact
Planning a large AI deployment, or looking to invest or partner? Start the right conversation.
Or email contact@santaritacomputing.com